Actionable Sprint Reports & Metrics

Track each sprint’s planned vs. completed work, velocity, and blockers. Use these insights to refine future sprints and keep stakeholders informed.
PR Lead Time for Changes
Sprint Scope Adjustments
AI Chat
Work Type Breakdown

Improve your development lifecycle end-to-end

Quality

Track bug rates, time-to-fix, and more to address quality issues at their source.

Efficiency

Look at cycle times, task sizes, and more to uncover hidden bottlenecks.

Predictability

Compare ticket, sprint, and project progress to plans and pinpoint delivery risks.

Value

See where engineering time went to track effort vs. value delivery.

Debug bottlenecks with ease

Debug bottlenecks with ease

Zoom in with minware’s full work timeline to see exactly what happened and why.
minware builds the timeline from Git, ticket, and meeting data using our patent-pending time model – no time tracking required.

Break down metrics by any historical field

Break down metrics by any historical field

All reports are fully editable with minware’s report builder.
Break down metrics like PRs merged or active work time by any current or historical field (e.g., PR approval or ticket label).
minware natively stores the complete history of every field (including custom fields and labels) for seamless end-to-end visibility.

Customize any metric with minQL

Customize any metric with minQL

Skip the Jira cleanup – all metrics are fully editable with minQL formulas.
Access any field from any source (including custom CSV/JSON uploads) with a full suite of database functions for total control and flexibility.
minQL also supports advanced SQL features like time-series joins and window functions.

Integrate with any source and front end

Integrate with any source and front end

minware integrates with popular Git, ticket, and calendar systems, as well as any custom CSV/JSON format.
View reports in minware’s dashboards, download CSV, or connect to any tool with our minQL-based ODBC driver.
GitHub
Azure
Jira
Google
CSV/JSON
More
Data Ingest
Identity Linking
Time Modeling
Performance Caching
Time-Native minQL Engine
minware Dashboards
CSV Export
BI Tools
Headless ODBC

Enterprise flexibility, security, and performance

We designed minware from the ground up for Fortune 500 customers to handle homegrown systems, fragmented tools, large orgs, and secure environments.

Dynamic Table Caching

The patent-pending minQL engine dynamically caches tables for on-the-fly custom metrics with instant results for millions of rows.

Custom Data Integration

Integrate seamlessly with any structured or semi-structured data source including flat file uploads and custom APIs. Read more >

Identity/Team Management

minware automatically normalizes aliases across all your systems and supports multi-level team structure imports in any format. Read more >

Role-Based Access Control

Easily control team and invidual data access permissions for minware users based on their role and team membership. Read more >

On-Premise Ingest Agent

The on-premise ingest agent uploads files to a shared storage bucket. You maintain full control over keys and data. Read more >

AICPA SOC 2 Type 2 Certified

minware is SOC 2 Type 2 compliant. Learn more and access the full SOC 2 report from our security documentation.

Frequently Asked Questions

How does minware improve visibility into sprint performance?

minware connects Git and ticketing to track how much work was completed, rolled over, or added late. These sprint metrics show sprint health more accurately than basic Jira reports.

Can minware replace manual sprint completion reports?

Yes. minware automates sprint completion reports showing scope change, planning accuracy, and sprint rollover. It removes the need for spreadsheets or end of sprint analysis sessions.

Does minware track engineering team metrics during sprints?

Yes. minware tracks sprint metrics dashboard KPIs like ticket flow, code review activity, unplanned work, and story point completion. These metrics help teams monitor sprint execution in real time.

Can minware measure the effectiveness of sprint planning?

Yes. minware calculates planning accuracy and scope stability for every sprint. It shows how often teams complete what they commit to and how often mid-sprint changes occur.

How does minware support sprint reporting across teams or departments?

minware provides cross-team sprint reporting for all Jira boards. It lets leadership compare sprint metrics like throughput and carryover across teams or business units.

Can minware detect delivery risks earlier in the sprint cycle?

Yes. minware flags issues like review delays, late merges, and scope volatility that can threaten sprint goals. This helps leaders intervene before the sprint fails.

What sprint metrics does minware track that tools like Jira do not?

minware tracks sprint-specific metrics including pre- and post-review time, rework rate, and unreviewed PR percentage. These are not included in standard platform-native sprint reports.

How does minware support measuring team productivity during sprints?

minware tracks output, rework, and effort allocation by ticket type to help teams evaluate how efficiently they use each sprint cycle.